Skip to Content

Call Us - Problem Solved
1-877-HELMER1
1-877-435-6371

Evidence Preservation on the Construction Job Site

March 21, 2012 | Posted In Business Litigation |

The need to repair construction failures on the job site may often destroy probative evidence of fault, such as material failure, poor workmanship or design defect. In the case of fire, water damage or structural weakness, urgent repairs may be needed to protect life and property. Unrepaired defects in critical path tasks may cause substantial delay, monetary losses and contract breach by innocent parties, and may compel immediate corrective action

Read Full Article

Call Us - Problem Solved


1-877-HELMER1
Helmer, Conley & Kasselman, P.A.

Time is of the Essence

Don’t let your rights be jeopardized.